How do I take a repair through to invoicing?
A service report goes through four repair statuses: Pending, Under repair, Repaired and Delivered. Each button on the Technical service tab moves it to the next one, and Invoice creates the delivery note or the invoice with its lines. The repair status isn’t the document’s status: an invoiced report still says whether it is repaired or delivered.
What do I need before I start?
A report that has already been saved. The cycle buttons only appear on an issued report that hasn’t been voided.
How do I do it?
- Open the report and click the Technical service tab. A chip says what status it is in.
- When the technician starts, click Start repair. The report changes to Under repair.
- Record what is done: the material and labour lines in the grid and, on the tab, the Technical solution (diagnosis, parts replaced, adjustments). Click Save to keep it.
- When it is ready, click Repaired. The program records the date.
- Click Invoice. A delivery note or an invoice is created with the report’s lines, according to Settings → Services and calendar → Technical service → Invoice the service report with. An invoice stays as a draft until it is issued; a delivery note is issued straight away.
- When the customer takes it away, click Delivered. The program records the delivery date.
What happens when I do it?
- Start repair, Repaired and Delivered change the status straight away, without saving the document. You can go back (Back to repair, Undo delivery) as long as no delivery note or invoice has been created from the report.
- Repaired stores the date and time it was ready; Delivered, the delivery date and time. Both appear in the repair time reports.
- Invoice uses up the report: it is marked as invoiced and no longer appears among what is pending. The parts leave the warehouse with the delivery note or the invoice, not before.
- A Delivered report opens read-only: it can no longer be edited.
Common cases
Can I invoice before repairing?
By default, no: Invoice is greyed out until the report is Repaired, and the button says why. In Settings → Services and calendar → Technical service → To invoice a service report you can require Nothing (invoice in any status) or Delivered.
How do I change the technician?
Type another code in Technician and save. Labour lines that had no technician move to the new one; those that already had one stay as they were.
What happens with a repair under warranty?
With Under warranty ticked the lines are valued at zero, so Invoice creates a delivery note or an invoice for 0 €: it serves as proof of delivery. If any part is charged, give it a price before invoicing.
What if the report came from the assistant or the board?
It is the same report. The board moves the status by dragging; the assistant moves it with ‘move service report 23 to repaired’ and invoices it with ‘invoice service report 23’, always asking for confirmation.
How does the customer sign?
The report takes a signature like any document: with Sign in the action bar the customer signs on screen when dropping off the equipment or collecting it. The signature appears on the printed report.
If something goes wrong
| What you see | What has happened | What to do |
|---|---|---|
| Invoice greyed out with ‘The settings require the service report to be repaired’ | The report hasn’t reached the status the company requires | Click Repaired first, or change the requirement in Settings |
| ‘A delivery note or invoice has already been created from the service report: it cannot be reverted’ | You are trying to undo a delivery or a repair that has already been invoiced | Void the delivery note or the invoice first, if appropriate |
| ‘The service report has no lines to invoice.’ | There is no material or labour | Add the lines and save |
| ‘Cannot change from … to …’ | You are asking for a jump the cycle doesn’t allow (for example, from pending to delivered) | Follow the order: repair, repaired, delivered |