Who are the workers and how are they maintained?
A worker is whoever works the hours on a production report. The program stores their code, their name and what one hour of their time costs, which is where the real cost of labour on what is produced comes from.
Do I have to set people up before I start?
No. A worker’s record is created on its own the first time someone logs hours on a report. If the person working uses the program, the system recognises them by their user, creates their record with the name they have in the company and carries on without asking anything.
That leaves only one case in which you have to type something by hand: the workshop worker who doesn’t log in to the program. They have no user, so nobody can create them on their behalf, and they are set up from this screen.
The other reason to come here is the cost per hour, which can’t be guessed: the record starts at 0 and someone fills it in.
Where is the screen?
In the Production → Workers menu. It is a list with five columns: Code, Name, Cost/hour, Linked user and the status (Active or Inactive).
At the top there is a search box that looks in the code and the name at the same time, ignoring capitals and accents: typing ‘perez’ finds ‘Juan Pérez’.
Next to it is the Show inactive box. To begin with, the list only shows those who can clock hours today; ticking it also shows those who have been retired, which is how you reactivate them.
What do I fill in when I create a worker?
The New worker button opens a window with five fields:
- Code (required). It is the short identifier typed on the report’s hours line. The program saves it in the format the company has set up —usually in capitals—, so typing ‘op1’ and typing ‘OP1’ is the same, and the second is rejected as a duplicate.
- Name (required). It is saved exactly as typed, with its capitals and its accents.
- Cost per hour. What one hour of this worker costs. With 0, the program uses the price of the hours item instead of a cost of its own.
- Linked user. The company employee it corresponds to, if they also use the program. The option — none — is normal and isn’t a gap to fill: a workshop worker doesn’t need to log in to the ERP.
- Active worker. Ticked by default.
What is linking a worker to a user for?
So that the program knows who is clocking hours without anyone typing it. When the person logging hours on a report is the same one who has logged in to the program, the system recognises them through that link and fills in the line’s worker on its own.
Without a link the worker works just the same, but you have to name them by hand by their code on each report.
The link is set and removed whenever needed, from the same edit window. And the name shown in the Linked user column comes from the employee’s record: if it changes there, it changes here on its own.
How do I correct or retire a worker?
Each row has two icons. The pencil opens the same window as when creating, with the details already filled in: you can change the code, the name, the cost per hour and the linked user.
The other icon activates or deactivates. An inactive worker is no longer offered on new reports, but old reports keep them: the hours they worked are still theirs and the cost of those reports doesn’t move.
There is no deletion. This is on purpose: deleting someone who signed off hours would leave reports already produced without knowing who did them. Retiring is what you want almost every time, and it is undone by marking them active again.
What happens if I change someone’s cost per hour?
It applies from now on, not to what has already been produced. The cost of a report is calculated and saved at the moment of producing, so raising the hourly rate today doesn’t rewrite what a report from last month cost.
It is the same idea as with an item’s price: what has already happened stays as it happened.
More about Production
- How are the cost and price of a composite item calculated?
- How do I set up an item’s bill of materials?
- How do I produce with a production report?
- Producing and assembling items
- How do I manage a production job with an order?
- How do I see what has been done on a project and the hours it has taken?
- What is a bill of materials and when do I need one?
- What happens when I sell a composite item?