What is a bill of materials and when do I need one?
A bill of materials —also called a recipe— is the list of the items another item is made from. A kit made of five screws and five nuts has a bill of materials with two lines. With it, the program knows what to consume when you produce that kit and how much it costs you to make it.
What is a composite item?
A composite item is an item that has a bill of materials. There is no box to tick and no separate type of item: the item becomes composite as soon as you give it a bill of materials, and stops being composite when you delete it.
That means two practical things. The first is that you don’t have to decide it when you set the item up: an ordinary item becomes composite the day you ask it to. The second is that a composite item is still an ordinary item for everything else: it is sold, it is bought, it has stock, it has batches and it appears in the same reports.
A component can also be composite itself. A kit can contain a sub-assembly that, in turn, contains its own parts.
What does ‘per N units’ mean?
The quantities in a bill of materials aren’t ‘what one unit contains’: they are what a batch of N units contains. That N is the Base units field of the bill of materials.
It is done this way because many bills of materials don’t come out as whole numbers per unit. If 5 pieces come out of one sheet and each sheet takes 5 screws and 5 nuts, the bill of materials is written with Base units = 5, quantity 5 of screws and quantity 5 of nuts. When you produce 10 pieces, the program consumes 10 screws and 10 nuts, not 50.
The sum it does is always the same:
component quantity = units to produce × bill of materials quantity ÷ Base units
If your bill of materials is per unit, leave Base units at 1 and the quantities are read as they are. It is the most common case and it is the value a new bill of materials starts with.
What is having the bill of materials entered for?
It is for three things, and each one can be used without the others:
- Producing. With a production report you bring the product into the warehouse and take its components out, all in one document. You don’t have to type the consumption by hand.
- Selling a composite item. If you set it up that way, when you sell the product its components are deducted instead of the product (or as well as the product, depending on what there is in stock).
- Knowing the cost. The program calculates what one unit of the product costs by adding up what its components cost, and it can copy that cost to the item record.
None of this happens just because the bill of materials exists: producing is a document you create, selling with components is a settings option and copying the cost to the record is too.
How deep can the bill of materials go?
A bill of materials can be chained up to ten levels: a product that contains a sub-assembly, which contains another, and so on up to ten. It is a safety limit, not a recommendation.
Within a document the breakdown goes down to three levels: the product, its components and their components. Below that the program doesn’t break things down, because a document with four levels of detail can no longer be read.
The program doesn’t allow cycles. If you try to make A contain B and B contain A —directly or by going round through other items— the bill of materials is rejected when you save it and you are told why. A cycle can’t be produced: there would be nowhere to start.
Next: Set up an item’s bill of materials · Produce with a production report
More about Production
- How are the cost and price of a composite item calculated?
- How do I set up an item’s bill of materials?
- How do I produce with a production report?
- Producing and assembling items
- Who are the workers and how are they maintained?
- How do I manage a production job with an order?
- How do I see what has been done on a project and the hours it has taken?
- What happens when I sell a composite item?